Reno Nevada's Premier Local Plumbing Service

50/50 Brewing Company Truckee, CA

Posted by admin in Our Projects - (Comments Off on 50/50 Brewing Company Truckee, CA)

50/ 50 Brewing Company is located in Truckee, California, at this location they have a full serve restaurant and micro brewing facility.

 

NDI recently added 2 – 10 barrel brewing tanks to the 5 tanks they were running on before.

NDI re-plumbed the chilled water piping to the 5 existing tanks and ran new chilled water supply and chilled water return to the new tanks.

We installed a differential bypass at the end of the loop to maintain a balanced system.

We installed control valves so that they could raise and lower the temperature inside the tank during the brewing process.

We recharged the chiller with an ethanol mixture to provide a complete chemical system.

All piping was installed to meet FDA health regulations for restaurant and food facilities.

All piping was insulated with 1″ fiberglass insulation.

All fiberglass insulation was jacketed with a PVC jacket so that it could be washed down.

NDI performed a full turnkey installation and the new tanks are now brewing Truckee’s finest micro brews this area has to offer.

Please stop by and enjoy a cold one if you get a chance.

IMG_1272 IMG_1269

IMG_1268 IMG_1267 IMG_1266 IMG_1265 IMG_1264 IMG_1263 IMG_1262 IMG_1261 IMG_1260

Carson City Digester

Posted by admin in Our Projects - (Comments Off on Carson City Digester)

NDI recently completed the 5 year waste water treatment digester reconstruction for Carson City Public Works and the State of Nevada, here is what your tax dollars are doing!

During the process of waste water treatment the liquids go through a digester process where the methane gasses are collected and burned off which is a very highly explosive gas that has to be safely removed throughout the process, these digester tanks are under high temperatures and extreme corrosive conditions which means complete rebuild every 5 years at a cost to the State of Nevada of over $1,000,000.00 per overhaul.

 NDI portion of this project consisted of fabrication and installation of the piping and mechanical system that removes the explosive and highly corrosive gases.

 The Tasks that NDI performed on this job were the following:

Design of the vapor recovery piping system

Provided shop drawings for the state engineers approval

Fabrication of the 6″ stainless steel welded piping

We used acid resistant valves

Installed 3 flame arrestors used to eliminate the possibility of explosion due to heat, pressure, and highly flammable gases

Installation of a sediment trap to trap free particles in the system

Piping of the 6″ stainless steel piping back to the boilers that burn off the vapors

Stainless steel pipe stands

2″ stainless steel drain back to containment tanks

Insulation

Engineered stamped calculations for seismic bracing and loads

Crane service to get equipment to the top of the digester

All work and materials had to be explosion proof and safety conditions were a huge part of this project

image22image21 image20 image19 image18 image13 image12 image11 image10 image9 image8 image3 image4 image5 image6 image7 image2 image

image17 image16 image15 image14

I would like to give a special thanks to K-2 engineering for their part in assisting with the seismic calculations on this project!